The Sutro Tunnel was finished in 1878. The tunnel was 3.88 miles long. Construction of the tunnel began Oct. 19, 1869, and the Mission-style portal was finished in 1888. A photo caption on page C2 of Tuesday's edition was incorrect.
The Nevada Constitution will be on display at the Nevada State Library and Archives, 100 N. Stewart St. from noon-3 p.m. Saturday. The Nevada Day events schedule on page A6 of Tuesday's edition was incorrect.