The following information applies to the period of Sep. 28 - Oct. 4:
As part of the City's annual slurry seal project, striping will occur in the general vicinity of the area bounded by Carson Street to the east, Mountain Street to the west, Winnie Lane to the north, and Washington Street to the south. Minor delays are possible.
Frontage improvements will continue along the south side of Old Clear Creek Road approximately between Bodines Casino and Vista Grande Boulevard, including the area along Fuji Park. In addition, a temporary bus stop for the Jump Around Carson (JAC) service has been located and signed to the west of the current location, just east of Vista Grande Boulevard.
Construction of the North Stewart Street Extension from East John Street to North Roop Street is continuing. The following lane closures are expected to occur:
• U.S. 50, eastbound right lane at Stewart Street closed on Monday, from 9 p.m. to 6 a.m.
• Long Street will be closed from Roop Street to Peters Street on Monday.
• U.S. 50 closed at Stewart Street on Thursday from 7 p.m. to 6 a.m., traffic detour provided
• Park Street will be closed from Stewart Street to Fall Street.
• John Street will be closed from Fall Street to Andrew Street through the completion of the project.
• Stewart Street will be closed from U.S. 50 to John Street.
• On U.S. 50, the eastbound left turn lane at Stewart Street will be closed.
The reconstruction of Curry Street from Koontz Lane to Rhodes Street is under way. The following lane closures are expected to occur:
• South Curry Street reduced to single-lane traffic with delays and pilot car from Rhodes Street to Koontz Lane 7 a.m. to 4 p.m. weekdays.
• South Curry Street will be closed to through traffic from Koontz Lane to Rhodes Street on Saturday and Sunday for paving and striping.
• Moses Street west of Carson Street (U.S. 395) will be closed to through traffic on Saturday and Sunday for paving and striping.
• Rhodes Street reduced to single-lane traffic with delays from Carson Street to South Curry Street 7 a.m. to 4 p.m.
• Moses Street reduced to single-lane traffic with delays from Carson Street to 300 feet west of South Curry Street p.m.
For more information, call Patrick Pittenger at 887-2355 x30396.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment