Carson City road report for Oct. 19-25

Share this: Email | Facebook | X

The following information applies to the period of Oct. 19-25.

Beginning Tuesday, Oct. 20, Division Street will be closed between Fifth and King streets due to road construction. Detours will be signed.

On Monday, Oct. 19, Combs Canyon Road will be closed between Lakeview and Vista Ariana drives due to roadway maintenance. Lakeview residents are advised to use Hobart Road for access. In addition, Vista Ariana Drive will be closed to through traffic on Thursday, Oct. 22.

Utility work will continue during daytime hours, Monday through Thursday, with flagger controlled traffic at the following locations:

Mountain Street between Fleischmann Way and Long Street

Long Street between Mountain and Division streets

Division Street between John and Long streets; local access only

Sierra Circle, Hillside Way, Miller Way, Pine View Way, and Lane Circle

NDOT will continue paving operations on I-580 in Washoe Valley. There will be nightly lane closure in both directions of I-580 from the Eastlake Boulevard interchange to the Bowers Mansion Road interchange.

There will be a lane closure on Oregon Street with flagger controlled traffic between Roop Street and Wright Way on Tuesday, Oct. 20, and Wednesday, Oct. 21, as work continues at the NDOT maintenance yard.

The intersection of Cochise and Overland streets, as well as Cochise Street between Overland Street and Roventini Way, will be closed to through traffic from 7 a.m. to 5 p.m. weekdays. Detours will be signed.

Utility work will continue Monday through Thursday at the following locations:

Intermittent lane closures with flaggers on Washington Street between Ormsby Boulevard and Mountain Street

Intermittent lane closures on Race Track Road between Bigelow and Schulz drives with flagger controlled traffic weekdays

The north shoulder of Snyder Avenue between Oak Street and Bigelow Drive

There will be a lane closure on Hillview Drive between Clearview Drive and Appion Way from 7 a.m. to 5 p.m. beginning Wednesday, Oct. 21, through Friday, Oct. 23.

The Nevada Department of Transportation will continue construction of drainage improvements on U.S. Highway 50 West between the two truck ramps (just west of U.S. 395 to Sierra Highlands Drive). There will be lane closures weekdays, but the roadway will remain open to traffic in both directions.

Clear Creek Avenue remains closed to through traffic between Lynette Lane and Center Drive due to utility work. Detours are signed and the JAC bus stop on Clear Creek Avenue is temporarily relocated near the intersection of Frontage Road and Clear Creek Avenue.

Work on the construction of the Carson City Freeway continues. Please use caution in the areas around the construction site, particularly along S. Carson Street.