Road report as of Thursday. The following applies to Sept. 19-25:
Road closures are expected at the following locations due to road/utility work:
Challenger Way between College Parkway and Hot Springs Road will be closed, Monday-Friday, 8 a.m. to 5 p.m. for utility work.
Mountain Street between Long Street and Fleischmann Way will be closed, Monday – Friday, 7 a.m. to 5 p.m. for utility work.
Overland Street between Voltaire Street and Cochise Street will be closed, Monday-Friday, 7 a.m. to 7 p.m. for utility work.
Park Street between John Street and Long Street will be closed, Monday-Friday, 8 a.m. to 5 p.m. for utility work.
Lane restrictions are expected at the following locations due to road/utility work:
Short line striping and painting will take place along Carson Street and William Street, Tuesday-Thursday, 6 p.m. to 6 a.m. Do not pass painting trucks.
The following streets will have narrowed lanes and shoulder work between Nevada Street and Mountain Street, Monday-Thursday, 7 a.m. to 5:30 p.m.: Caroline Street, Robinson Street, Spear Street and Telegraph Street.
Carson Street at Clearview Drive will have shoulder work, Monday-Thursday, 7 a.m. to 5:30 p.m., for signal repairs.
Clearview Drive at Carson Street will have lane reductions, Tuesday-Thursday, 7 a.m. to 5:30 p.m. for signal repairs.
College Parkway between Goni Drive and the northbound I-580 on-ramp will have lane reductions, Monday-Friday, 10 a.m. to 3 p.m. for utility work.
Conte Drive between Damon Road and Valley View Drive will be reduced to one lane with flaggers, Wednesday, 7 a.m. to 5 p.m. for roadway construction.
5th Street between Saliman Road and Warm Springs Road will be reduced to one lane with flaggers, Monday-Friday, 7 a.m. to 6 p.m. for utility work.
Forrest Way between Goni Drive and the cul-de-sac will be reduced to one lane with flaggers, Monday-Friday, 8 a.m. to 5 p.m. for utility work.
Sheep Drive between Deer Run Road and Asphalt Drive will be reduced to one lane with flaggers, Monday-Friday, 7 a.m. to 4 p.m. for utility work.
Silver Sage Drive between Koontz Lane and Colorado Street will be reduced to one lane with flaggers, Monday-Thursday, 7 a.m. to 5 p.m. for pavement preservation.
Stewart Street between 7th Street and Musser Street will be reduced to one lane with flaggers, Monday-Friday, 7 a.m. to 6 p.m. for utility work.